The St. Clair County Transit District will receive sealed bids until 10:30 A.M. on May 14, 2024 at:
St. Clair County Transit District
27 North Illinois Street
Belleville, Illinois 62220
All bids will be publicly opened and read aloud at 10:35 A.M. on May 14, 2024. The sealed bids
must be delivered to and received by the St. Clair County Transit District before 10:30 A.M., May
14, 2024.
The proposed project consists of cleaning and painting the structural steel beams, or portions
thereof, of the bridge carrying the MetroBikeLink over IL Route 161 (SN 082-7003) and any other
work necessary to complete the project as described. All work shall be performed in accordance
with the Illinois Department of Transportation (IDOT) Standard Specifications for Road and Bridge
Construction, edition in effect at the time of the bid.
IDOT Prequalification in Category 25 – Painting and Cleaning is required for all bidders.
The successful bidder will be required to enter into a Project Labor Agreement.
No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing
Wage Act, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workers
employed in the construction on this project.
The Project Specifications, Provisions, and Proposal Packet are available for download from the
www.scctd.org website. Contractors downloading proposals must register their email with the St.
Clair County Transit District by emailing Tony Erwin at terwin@scctd.org. Bids will not be
accepted or opened which have been received from any bidder who is not a bid document holder
of record.
*Please be advised, when downloading/obtaining plans, SCCTD must be contacted to ensure any future addendums are received.
PDF’s of bid documents below: