Proposals Requested for SCCTD 2023 Bike Trail NSRR Bridge Deck Replacement Project

The St. Clair County Transit District will receive sealed bids until 1:30 P.M. on AUGUST 8, 2023 at: St. Clair County Transit District 27 North Illinois Street Belleville, Illinois 62220
All bids will be publicly opened and read aloud at 1:35 P.M. on AUGUST 8, 2023. The sealed bids must be delivered to and received by the St. Clair County Transit District before 1:30 P.M., AUGUST 8, 2023.

The proposed project consists of the removal and replacement of the existing pressure-treated timber deck planks and guardrail of the bridge carrying the MetroBikeLink over the Norfolk Southern Railroad and Richland Creek in Swansea, Illinois, and any other work necessary to complete the project as described. All work shall be performed in accordance with the Illinois Department of Transportation (IDOT) Standard Specifications for Road and Bridge Construction, edition in effect at the time of the bid.

IDOT Prequalification is required for all bidders. No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage Act, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workers employed in the construction of this project.

The Project Specifications, Provisions, and Proposal Packet are available for download from the www.scctd.org website. Contractors downloading proposals must register their email with the St. Clair County Transit District by emailing Jon Schaller at jschaller@gocos.net. Bids will not be accepted or opened which have been received from any bidder who is not a bid document holder of record.

2023 Bike Trail NSRR Bridge Deck Replacement Package