Notice of SCCTD Bike Trail Bridge Deck Replacement

The St. Clair County Transit District will receive sealed bids until 10:00AM, November 5, 2026, at:
Belleville Transit Center
718 Scheel St.
Belleville, IL 62220

All sealed bids must be delivered to and received by the St. Clair County Transit District before 10:00AM, November 5th, 2026. Received bids will be opened publicly and read aloud at 10:00 AM on November 5th, 2026.

The proposed project consists of the removal and replacement of the existing treated wood deck for the S. McKinley bike trail bridge located at approximately MetroLink Mile Post 31.78, SCCTD Mile Post 8.2, East of the McClintock Bike Trail Bridge in Belleville Illinois, and any other work necessary to complete the project as described. See Exhibit A for more details. All work shall be performed in accordance with the Illinois Department of Transportation (IDOT) Standard Specifications for Road and Bridge Construction, edition in effect at the time of the bid.

IDOT Prequalification in Category 1 – Earth Excavation is required for all bidders.

No less than the prevailing rate of wages, as determined in accordance with the Illinois Prevailing Wage Act, shall be paid to all laborers, operators, teamsters, masons, plumbers, and any workers employed in the construction on this project.

The Project Specifications, Provisions, and Proposal Packet are available for download from the www.scctd.org website. Contractors downloading proposals must register their email with the St. Clair County Transit District by emailing Tony Erwin at terwin@scctd.org and Austin Rauscher at arauscher@scctd.org.

2026 Bridge 31.78 Deck Replacement Proposal

2026 Bridge 31.78 Deck Replacement Request for Bids

2026 Bridge 31.78 Deck Replacement Special Provisions

Exhibit A – Location

Exhibit B – As Built Drawings

Exhibit C – Shop Drawings & Calculations